Location: Houston, Texas
Provided the IT and Security System Engineering Services. Divided into eight design elements with both new and renovated spaces, the project includes multiple facets including: construction of a new 185,275 sqft wide-body line maintenance hangar, renovation of an existing 72,000 SF structure into a narrow body heavy maintenance hangar, a new bulk storage warehouse, a new shops building, a stores warehouse renovation, plus a new apron, parking ramp and taxi lane. The large hangar accommodates 3 wide-body aircraft, with a space covering more than four acres. Also included in the project was a 28,000SF 2-story administrative Building, 17,800SF of GSE with Loading dock and a 33,300SF Engineer Rebuild Room with support spaces. The IT and security systems were broken out for separate entities including the airport authority (HAS) and the tenant (UA) system. Each system connected to separate facilities within the campus to assure extension of the fiber network to the new property. The project also included an apron capable of supporting 4 aircraft parking positions with run up wall. Wireless coverage and surveillance were provided for the apron in addition to monitoring for the ground power and PC air units.