Location: Houston, Texas
Provided the electrical engineering for the project. The building consisted of 4 stories with a total of 98,000 square foot. The construction cost was estimated at 18 million dollars. The building included classrooms, lecture halls, seminar rooms, faculty/administrative offices and associated support and circulation spaces. The electrical system included distribution and branch style panelboards, a main distribution switchboard and a diesel fueled 350KW generator. This building is an extension of the downtown campus. The fire alarm system, building automation, security, data network and telephone systems tied back to the main campus.